Ask any questions
Get in touch
Date
dd01020304050607080910111213141516171819202122232425262728293031 mm010203040506070809101112 yyyy20252024202320222021202020192018
Next FT Number
F/T ESN No 1
F/T ESN No 2
F/T ESN No 3
F/T ESN No 4
F/T APU
Company Name
Project Managers Name
Position
Department
Email
Phone
Field Rep Name
Field Rep Email
Field Rep Mobile
Your Accounts Email to submit invoice
Your Entity / Cost Centre Address to be put on Invoice
ACG Acquisition Ireland Limited Alexandra Office The Sweepstakes, Ballsbridge Dublin 4, IRELAND ---- Please CHECK THIS IS CORRECT ENTITY AND AMEND ACCORDINGLY!
Service Type
—Please choose an option—SERVICE BULLETIN (SB)HPC Onetime Blade Blend Re-InspectionEnd of Lease Borescope Inspection (Full Front to Rear)Pre Purchase Borescope Inspection (Full Front to Rear)Borescope Inspection (Sit-on Witness Review)MPD Task (Airline Mandatory Borescope Inspection)Hot Section Inspection OnlyLPC and HPC Inspection OnlyHPC Compressor Repair (Blend)HPC Blade Removal / Installation (CFM56 Topcase)
MSN
Aircraft Type
—Please choose an option—Boeing 737-300/-400/-500Boeing 737-600/-700/-800/-900Boeing 737-NGBoeing 747Boeing 757Boeing 767Airbus A318Airbus A319Airbus A320Airbus A321Airbus A330Airbus A340
Engine Type
---CFM LEAPCFM56-3CFM56-5ACFM56-5B NON/PCFM56-5B/P/3/1CFM56-5CCFM56-7V2500 A1V2500 A5CF6-50CF6-80GE90GE90-115Engine Alliance GP7200TRENT 500TRENT 700TRENT 800RB211-535 SeriesRB211-524 SeriesCF34-10CF34-8CF34-3Pratt & Whitney PW2000 SeriesPratt & Whitney PW4000 Series
ESN No.1
ESN No.2
ESN No.3
ESN No.4
APU type
—Please choose an option—Apic APS 3200Apic APS 2000Honeywell 131 SeriesGarrett GTCP 36Garrett GTCP 85Garrett GTCP 331Garrett GTCP 600Hamilton Sunstrand APS 500Hamilton Sunstrand APS 500 RHamilton Sundstrand APS2300Pratt & Whitney P901A
APU S/N
Applicable Temporary Revisions
Will the work be carried out
InsideOutside
Attach Chapter 72 Engine Aircraft AMM Here! (Max file size:15 MB | Allowed extensions- doc, docx & pdf)
Attach Chapter 49 APU Aircraft AMM Here! (Max file size:15 MB | Allowed extensions- doc, docx & pdf)
Attach Any Previous Borescope, carry forward or deffered documents here! (Max file size:15 MB | Allowed extensions- doc, docx & pdf) If you do NOT have these items to hand, minimise this page and continue later
AMM Revision No. and Date
SCOPE OF WORK: Please enter ALL Required Tasks as Per AMM (THIS DOCUMENT IS THE BASIS OF THE CONTRACTUAL REQUIREMENTS FOR THE TASKS TO BE PERFORMED BY TEAM EUROPE LTD FOR THE CUSTOMER)
LOW PRESSURE COMPRESSOR (TASK 72-00-00-200-017-B) HIGH PRESSURE COMPRESSOR (TASK 72-00-00-200-016-B) COMBUSTION CHAMBER & HPT STAGE 1 VANES (TASK 72-00-00-200-013-B) STAGE 1 HPT BLADES & DUCT SEGMENTS (TASK 72-00-00-200-014-B) STAGE 2 HPT BLADES & DUCT SEGMENTS (TASK 72-00-00-200-015-B) LOW PRESSURE TURBINE STAGE 3 BLADES (TASK 72-00-00-200-012-A) LOW PRESSURE TURBINE 7th STAGE BLADES (VISUAL) (TASK 72-00-00-210-010-A) AS PER PREVIOUS ENGINE INSPECTIONS
Release Certificate Required
EASA Form 1EASA Dual ReleaseNo Certification RequiredCertificate of Conformance
Country
—Please choose an option—UKEuropeAsiaIndiaChinaUSAUAEIrelandQATAR
Facility Location
Urgency Level
—Please choose an option—LowMediumHigh
Commencement Date
Purchase Order
Details of Engine Hours / Cycles and any Special Requirements
Please prove you are human by selecting the Key.